简而不凡 质藏细节
Construction began in November 2022 and the company officially went into production in April 2023. It is an integrated enterprise specializing in the design, manufacture, and installation of steel structures and grid structures. In 2022, the factory area of the Guangdong Zhaoqing base was 26,000 square meters; there were over 150 employees, 3 standard production lines, and an annual output value of 200 million yuan.
精选项目
新闻动态
On December 17, 2024, the Department of Science and Technology of Guangdong Province released the List of the Second Batch of High-tech Enterprises in 2024. Relying on its technological R&D strength and green production innovation, Guangdong Green Construction Steel Structure Engineering Co., Ltd. passed the certification again, marking its third time winning this honor since 2021.
As the National Day holiday approached, on the afternoon of September 20, 2024, Li Peirong, Secretary of the CPC Enping Municipal Committee, led a team to conduct an inspection tour at Guangdong Green Construction Steel Structure Engineering Co., Ltd.
合作伙伴









































